Do I Need a Permit for a New Driveway in Melbourne's Northern Growth Corridor?
- sharon00347
- 7 days ago
- 2 min read
Yes — if you're in Beveridge, Wallan, Kilmore, Broadford, Seymour, Nagambie, or Craigieburn, you need a council permit before building or altering a driveway that connects to the road. This applies across Mitchell Shire, Strathbogie Shire, and Hume City Council — each has its own process, but the requirement itself is universal.
What the permit actually covers
The permit isn't for your whole driveway — it's specifically for the section that crosses public land: the nature strip, footpath, and the connection point to the road (known as a "vehicle crossing" or "crossover"). Councils regulate this section because it affects drainage, street trees, underground services, and pedestrian safety — not because they're regulating what happens on your own property.
What each council requires
Mitchell Shire (covers Beveridge, Wallan, Kilmore, Broadford, and Seymour): You'll need a Works within the Road Reserve permit (also called a road opening permit). Council requires proof of public liability insurance for a minimum of $20 million, and applications are typically processed within 10 business days. Once issued, the permit is valid for 3 months.
Hume City Council (covers Craigieburn): A permit is required before constructing or altering any vehicle crossing. Applications can be lodged at the Broadmeadows, Sunbury, or Craigieburn council offices, and 24 hours' notice is required before council inspects the crossing prior to the concrete pour.
Strathbogie Shire (covers Nagambie): Also requires a Works within Road Reserve permit, with a minimum public liability insurance requirement of $10 million.
What you'll typically need to apply
A completed permit application specific to your council, a site plan showing the location and dimensions of the proposed crossing, a current certificate of public liability insurance meeting your council's minimum, and payment of the relevant council fee.
How Pro-X helps
We handle the permit process as part of every driveway project in our service area — so you're not stuck figuring out which council form applies to you, or chasing down insurance certificates yourself. We manage the paperwork, meet each council's construction standards, and make sure the crossing passes inspection the first time.
Quick answers
Do I need a permit if I'm just repouring an existing driveway in the same spot?
Generally, yes — any construction or alteration work on the crossing itself typically requires council sign-off, even if you're not changing its size or location. Requirements can vary, so it's worth checking with your specific council or asking us to confirm before work begins.
How long does the permit process take?
This varies by council — Mitchell Shire, for example, typically processes applications within 10 business days. Building this into your project timeline avoids delays once you're ready to pour.
Does Pro-X organise the permit, or do I need to do it myself?
We take care of the permit application as part of our driveway and crossing work — one less thing for you to manage. Contact us for a free quote and we'll walk you through what's needed for your specific address.

Comments